Client / Year |
|
Engineering and technical consulting |
|
| ROMELECTRO-Bucharest, Romania |
|
Boilers retrofitting and modernization |
| |
|
Equipping boilers with low NOx emission burners |
| 2005 |
|
West Bucharest Power Plant
- Steam boiler, 525 t/h no.2
|
| 2006 |
|
South Bucharest Power Plant
- Steam boiler, 525 t/h no.5 and 6
|
| 2007 |
|
Bucharest-Progresu Power Plant
- Steam boiler, 420 t/h no.3 and 4
|
| 2008 |
|
Bucharest-Progresu Power Plant
- Steam boiler, 420 t/h no.2
|
| 2009 |
|
Galati Power Plant
- Steam boiler, 420 t/h no.6
|
| 2010 |
|
Galati Power Plant
- Steam boiler, 420 t/h no.7
|
| 2011 |
|
Galati Power Plant
- Steam boiler, 420 t/h no.8
|
| 2010 |
|
SE Mures-Iernut Power Plant
- Steam boiler, 640 t/h no.5
|
| 2012 |
|
SE Mures-Iernut Power Plant
- Steam boiler, 640 t/h no.6
|
| ISPE-Bucharest |
|
Rehabilitation high power groups |
| 2005 |
|
Isalnita Power Plant
- Steam boiler, 510 t/h no. 7A and 7B
|
|
| FESTO-Romania |
|
Modernization of combustion equipment |
| 2003 |
|
Iernut Power Plant
- Steam boiler, 330 t/h no.1,3 and 4
|
| 2003 |
|
Palas-Constanta Power Plant
- 100 Gcal/h hot water boiler no.1 and 2
- Steam boiler, 105 t/h no.3
|
| 2004 |
|
Zaharul Buzau Power Plant
- Steam boiler, 50 t/h no.1 and 2
|
| 2004 |
|
Doicesti Power Plant
- Steam boiler, 645 t/h no.7
|
| 2005 |
|
Victoria Floresti Thermal Plant
- Steam boiler, 30 t/h no.2
|
| 2007 |
|
RAT Cluj-Napoca: CTZ Someş-Nord
- 100 Gcal/h hot water boiler no. 2
|
| 2003 | | Oradea I Power Plant
- Steam boiler, 165 t/h no. 1 and 2
|
| 2004 | | Oradea I Power Plant
- Steam boiler, 350 t/h no. 3
|
| 2004 | | Tulcea City Hall
- 50 Gcal/h hot water boiler no. 1
|
| 2006 | | COLTERM Timisoara
- 100 Gcal/h hot water boiler no. 3
|
| 2007 | | Gavana-Pitesti Power Plant
- 100 Gcal/h hot water boiler no.3
|